Savill Group Architecture

Menu

  • Architecture
    • Residential
    • Commercial
    • Institutional
  • Art
    • Shows
    • Events
    • Links
  • About
    • Blog
    • Savill Group
Skip to content
  • Architecture
    • Residential
    • Commercial
    • Institutional
  • Art
    • Shows
    • Events
    • Links
  • About
    • Blog
    • Savill Group

Boys and Girls Club

ABOUT
Boys and Girls Club


Boys and Girls Grey Test Sketchesedit2Boys and Girls Club, Lethbridge, AB
Completion: 2000

This $800,000, 950sq.m complex was completed in 2000. John Savill had been involved with the project since it’s inception when the client did not have a site and had been having very little success raising funds. After some initial studies it was determined that the desired site for the building was the Adam’s Ice Centre Park. To understand the impact on the neighbourhood, a scale model was constructed showing the proposed building and its surroundings. Public meetings resulted in overwhelming support of the project and the city’s donation of the site enabled the boys and Girls Club to proceed with fundraising. we are proud of this project because it involved so much community support and because it resulted in such a positive environment for the children that use the space.

Institutional

  • Boys and Girls Club
  • Father Leonard Van Tighem
  • R.O.C Church
  • Chinook Arch Regional Library Headquarters
  • SAAG
  • Lethbridge Shelter
  • Taber Library
  • U of L Student Housing
  • Waterton Community Centre
See also:
  • Residential
  • Commercial
104 5th Street South, Lethbridge AB, Canada403-381-8888[email protected]
Full Site